Ambia brings interior design, construction, and project management together as a single discipline, coordinating the architectural, structural, and planning expertise your project requires through our established network of RIBA-accredited partners. The result is a continuous process, free of the gaps and handovers that typically slow ambitious builds.

Every project is led personally by our director, Sam Harb, who serves as your single point of contact from first consultation through to final handover. It is his assurance that each design decision is considered with intent, each programme milestone is met with precision, and every pound of your investment is fully accounted for.

Planning applications, structural calculations, party wall agreements, building regulations, construction and interiors. All managed through one relationship, so you are spared the task of orchestrating a dozen separate consultants. You speak to us. We deliver the rest.

Text that reads 'Designed, built, and delivered under one roof.'
A wooden desk with minimalist decor, including a black laptop, a stack of white books, a glass vase with a purple flower, a beige table lamp, a notebook with a pen, and a cup, against a plain wall.
A wide, white banner with the text 'THE PROCESS' in gray capital letters and two gray lines on either side.
Text reading '12 Stages to Your Perfect Home' with a subheading about following a proven process for clarity and confidence in home projects.
Text reading "Discovery & Design" with a horizontal line above the words, on a light background.
Number '01' on a plain white background
CONTACT US

Use our online form to book a consultation call at a time and date that suits you. We look forward to gaining an in-depth understanding of what you would like to achieve and how we can help you.

CONTACT US

Number 02 in black font on a white background
CONSULTATION

During your consultation with our director Sam Harb, we'll explore the aims, requirements, desired finishes and possibilities of your project in full.

White background with the number '03' in black centered.
BUDGET ESTIMATES

If you're happy to proceed, we will visit the property and gather the information needed to produce a budget build cost, including project management, design fees and other fees as required. We can enter into a binding agreement upon approval of the provisional numbers.

Number 04 on a white background
MEASURED SURVEY

Our RIBA approved architect will visit your property and survey all required measurements to produce accurate drawings of the proposed development. The foundation for everything that follows.

Number five, displayed with a digital font.
PROPOSED DESIGN

The architect will produce schematic drawings for your approval and discuss any changes you would like to make before submission for planning permission. You review and sign off before anything is submitted.

Text reading 'PLANNING & APPROVALS' in gray uppercase letters on a plain white background.
Number 06 displayed on a white background
PLANNING PERMISSION

We submit the planning application on your behalf and negotiate with the local planning office to achieve the best result. Planning typically takes around two months. For listed buildings or challenging sites, we bring in specialist planning consultants.

Number 07 in black on a white background
BUILDING REGULATIONS

Once construction drawings are approved by building control, you are ready for build. We work with both local authorities and private building control companies. Interior design, scope of works and cost planning begin in parallel at this stage.

Number 08 displayed on a white background
STRUCTURAL CALCULATIONS

One of our fully qualified structural engineer partners will produce structural drawings, presenting a clear scope of how to achieve the construction requirements of the project safely and efficiently.

Number 09 displayed on a white background
PARTY WALL AGREEMENTS

Any structural alterations that connect to a neighbouring property will require a party wall agreement. We manage this process entirely. Liaising with neighbours and surveyors to resolve agreements as efficiently as possible.

Text saying "CONSTRUCTION & DELIVERY" in gray capital letters with a horizontal line on the left.
Number 10 centered on a plain background.
PROJECT MANAGEMENT & QS

Detailed cost planning to take the uncertainty and risk away from your project. We highly recommend instructing Ambia to project manage all processes and assume responsibility for health, safety and CDM 2015 compliance. We are also proficient in JCT and NEC contracts.

Number 11
CONSTRUCTION

Our in-house team of site managers, carpenters, and skilled tradespeople forms the backbone of every build, ensuring continuity of standards and a consistent hand on the tools. Where a project calls for specialist expertise. Joinery, bespoke metalwork, advanced structural works, we engage trusted sub-contractors selected for their craft, not their convenience.

The number 12 displayed in black on a white background.
SNAGGING & HANDOVER

Once construction is complete, our snagging specialists carry out detailed walk-arounds listing any small finishing touches for revision. A professional cleaning team then gives the property a thorough clean, and we hand over your completed home in perfect condition.